Nick Scali Furniture

Located in Wetherill Park, NSW; Nick Scali Furniture’s 20,000sqm purpose-built development by Frasers property, is the company’s new furniture distribution centre and forms part of Frasers’ new Horsley Drive Business Park industrial estate.

Due to our long-standing relationship with Frasers Property, Wallandra was engaged to fabricate and erect over 300 tonnes of structural steel for the office-warehouse facility including the fabrication and installation of 9 staircases for various areas of the industrial property.

The premier industrial estate is ideally situated in what is a vibrant and fast growing area of Western Sydney, with access to primary motorways and large, experienced workforce.

Corkhill Bros

Corkhill Bros workshop Akura construction_WallandraRecycling roughly 70% of Canberra’s green waste; Corkhill Bros is a leading landscape supply and green waste management business, catering to Canberra and surrounds. Wallandra was commissioned to supply and erect 68 tonnes of structural steel including crane beams, stairs and handrails for the new workshop and servicing facility situated in Hume, ACT.

Supawood

Supawood structural steel buildings WallandraSituated in Bathurst NSW; Supawood is the leading brand in ceilings, delivering an extensive and diverse range of pre-finished architectural wall and ceiling lining systems across Australia and the UK.

Commencing early January; Supawood made the decision to undertake the construction of a new twin building development to accommodate their unprecedented growth, support their ability to continue to provide exceptional customer service and facilitate the delivery of new product innovations to the market.

Wallandra was commissioned to supply and erect almost 50 tonnes of structural steel for the development; which comprised of two warehouses, office space and mezzanine floor with stairs.

 

Mayfield Gardens

Inspired by the grandeur of English country garden estates, Mayfield Gardens is one of the world’s largest privately owned cool climate gardens. The exquisite garden extends across more than 160 acres and sits within a 5,000 acre working farm.

To support plans to expand the garden by an additional 36 acres within the year, Wallandra supplied and installed an open fronted storage shed with an enclosed workshop and a 6m skillion.

 

Motorsports Training Australia (MTA)

Home to Motorsports Training Australia (MTA), the Wodonga TAFE’s Logic Campus provides facilities through which the MTA deliver training to students interested in gaining motorsport and automotive technology qualifications.

Wallandra supplied and assembled over 15 tonnes of structural steel for the MTA workshop and carport, along with the concrete slab design and certification and supply and erection of the workshop windows.

These facilities provide students with the ability to work on race car preparation, fabrication and composites production.

Icon Builders – Gregory Hills

Fast Facts

Icon Builders and Wallandra Gregory Hills Development

  • Located at Gregory Hills, NSW
  • Icon Building and Construction
  • Design and Construct
  • 40 tonnes of Structural Steel
  • 3000m2 floorspace
  • For more information

The design included retail and office space, with the 3000m2 facility, incorporating 40 tonnes of structural steel. It is now home to a number of tenants including TyrePlus and Jetts fitness.

 

Realta making vehicle distribution a reality

Fast Facts

Realta-Structural-Steel• Location: Wollongong, NSW
• 145 Tonnes of Structural steel
• 8000m2 steel cladding
• 1000m2 precast concrete walls
• Construction continues

 

Realta Enterprises is a Wollongong based Property Development and Construction company undertaking the large project to build the new vehicle distribution centre in Kembla Grange. This will be the first destination of new cars shipped in for processing and delivery across the country.

Before the construction even started the site needed a great deal of attention.

The construction site was previously a farm in a flood affected area. In order to build up the site it required 1.6 million tonnes of coal wash. As the construction continues there is still 6000 tonnes delivered daily.

Once site preparation was complete Wallandra worked with engineer Ivo Olbrecht of OPTIMA CONSULTING ENGINEERS. The impressive project required 145 tonnes of structural steel delivered and installed.

To clad this structure 8000m2 of Trimdek made form COLORBOND steel has been installed along with 1000m2 of pre-cast walling for the office area, parts warehouse and dado panels.

Work continues! Whilst Wallandra is renowned for its expertise in the supply and erection of structural steel, this project has a more comprehensive scope with Wallandra taking this large building to lock up stage.

The structural steel went up in 3 weeks, the cladding is almost complete and the concrete team has begun pouring the 7100m2 floor. Following behind them, the door team will begin installing over 20 roller shutters and 10 PA doors.

Stay tuned to see the progress of this project.

 

Leandlease Designmake

Fast Facts

artist impression
• 15 000m2 + Office
• 400 tonnes of structural steel
• 26 loads of steel plus the stairs

Find more detail here

 

 

Visy Vision of Growth

Visy at TumutFast Facts

  • Supplied Structural steel and cladding
  • 100 tonne structural steel.
  • 380m2 cladding.
  • Addition to an operating site.
  • Read more detail here

 

Plasser Australia

Fast Facts

Plasser Australia structural steel supplied by Wallandra

  • Plasser Australia – manufacturing facilities
  • 250 Tonnes structural steel
  • 3000m2
  • Building size 150 x 30m
  • Crane runs the 150m length
  • Construction time four weeks
  • Find more information about this project here