Leandlease Designmake

Fast Facts

artist impression
• 15 000m2 + Office
• 400 tonnes of structural steel
• 26 loads of steel plus the stairs

Find more detail here

 

 

Plasser Australia

Fast Facts

Plasser Australia structural steel supplied by Wallandra

  • Plasser Australia – manufacturing facilities
  • 250 Tonnes structural steel
  • 3000m2
  • Building size 150 x 30m
  • Crane runs the 150m length
  • Construction time four weeks
  • Find more information about this project here

 

 

Australand – Winston Hills

Australand Toshiba at Winston HillsFast Facts

  • 13000m2 Floorspace
  • 300T of Structural Steel
  • 20 loads
  • Four weeks from commencement to completion

 

 

The convenience of the M7 right at your front door made the Australand Winston Hills property highly sought after for businesses needing easy access in and out.

This convenience, the large space and sustainable design practices of Australand were all considerations in the tenancy of Toshiba and Australian Geographic Retail distribution centre. Toshiba has signed up for 15 years and Australian Geographic is currently undertaking the large job of shifting to the new premises.

Winston Hills is Wallandra’s first in a recent trilogy of projects with Australand. Wallandra was able to provide Australand a competitive package, and having worked together previously, had the track record to deliver accurately under tight time constraints. The 13,000 m2 floorspace included 300 tonnes of structural steel, supplied by Wallandra. For more information on this project

 

Access Industries

Using precast walls, rather than traditional tilt up Wallandra saved six weeks on the project. The Wallandra program from start to finish was only nine weeks, with the standing of the walls and structural steel taking only eight days. More detail

Tru-Flo – Factory and warehouse

Wallandra was engaged by Truflo Pumping Systems to construct their 3000 square metre warehouse and manufacturing facility. Wallandra’s project scope included 110 tonnes of structural steel, concrete slab, all cladding and roller doors and a 5 tonne gantry crane. Additionally, Wallandra supplied footings and over 400 square metres of precast concrete retaining walls.

The quality Wallandra steel building perfectly complements Truflo’s modern office facilities.

 

 

OfficeMax

Wallandra supplied and installed 310 tonne of structural steel to support the impressive OfficeMax project for Australand. Completed in 2013 this building included 20,000m2 housing offices and distribution centre.

 

 

 

.

Toll in 2 Store

Even the largest of multinational logistics providers turn to Wallandra for the hassle free delivery of this distribution facility.

Cadia Plumbing – Head Office

This modern facility in Orange NSW completed in 2012 serves as head office and distribution centre for a plumbing supplies business, and is supported by a Wallandra steel frame.