Visy Vision of Growth

Visy at TumutFast Facts

  • Supplied Structural steel and cladding
  • 100 tonne structural steel.
  • 380m2 cladding.
  • Addition to an operating site.
  • Read more detail here

 

Tru-Flo – Factory and warehouse

Wallandra was engaged by Truflo Pumping Systems to construct their 3000 square metre warehouse and manufacturing facility. Wallandra’s project scope included 110 tonnes of structural steel, concrete slab, all cladding and roller doors and a 5 tonne gantry crane. Additionally, Wallandra supplied footings and over 400 square metres of precast concrete retaining walls.

The quality Wallandra steel building perfectly complements Truflo’s modern office facilities.