Motorsports Training Australia (MTA)

Home to Motorsports Training Australia (MTA), the Wodonga TAFE’s Logic Campus provides facilities through which the MTA deliver training to students interested in gaining motorsport and automotive technology qualifications.

Wallandra supplied and assembled over 15 tonnes of structural steel for the MTA workshop and carport, along with the concrete slab design and certification and supply and erection of the workshop windows.

These facilities provide students with the ability to work on race car preparation, fabrication and composites production.

Icon Builders – Gregory Hills

Fast Facts

Icon Builders and Wallandra Gregory Hills Development

  • Located at Gregory Hills, NSW
  • Icon Building and Construction
  • Design and Construct
  • 40 tonnes of Structural Steel
  • 3000m2 floorspace
  • For more information

The design included retail and office space, with the 3000m2 facility, incorporating 40 tonnes of structural steel. It is now home to a number of tenants including TyrePlus and Jetts fitness.

 

Realta making vehicle distribution a reality

Fast Facts

Realta-Structural-Steel• Location: Wollongong, NSW
• 145 Tonnes of Structural steel
• 8000m2 steel cladding
• 1000m2 precast concrete walls
• Construction continues

 

Realta Enterprises is a Wollongong based Property Development and Construction company undertaking the large project to build the new vehicle distribution centre in Kembla Grange. This will be the first destination of new cars shipped in for processing and delivery across the country.

Before the construction even started the site needed a great deal of attention.

The construction site was previously a farm in a flood affected area. In order to build up the site it required 1.6 million tonnes of coal wash. As the construction continues there is still 6000 tonnes delivered daily.

Once site preparation was complete Wallandra worked with engineer Ivo Olbrecht of OPTIMA CONSULTING ENGINEERS. The impressive project required 145 tonnes of structural steel delivered and installed.

To clad this structure 8000m2 of Trimdek made form COLORBOND steel has been installed along with 1000m2 of pre-cast walling for the office area, parts warehouse and dado panels.

Work continues! Whilst Wallandra is renowned for its expertise in the supply and erection of structural steel, this project has a more comprehensive scope with Wallandra taking this large building to lock up stage.

The structural steel went up in 3 weeks, the cladding is almost complete and the concrete team has begun pouring the 7100m2 floor. Following behind them, the door team will begin installing over 20 roller shutters and 10 PA doors.

Stay tuned to see the progress of this project.

 

Leandlease Designmake

Fast Facts

artist impression
• 15 000m2 + Office
• 400 tonnes of structural steel
• 26 loads of steel plus the stairs

Find more detail here

 

 

TNT – Super Hub

TNT-fleet-internal-close-up-strutural-steel-by-wallandra

Fast Facts

  • Structural Steel 850 tonnes
  • Area 30 000m2
  • Clearspans up to 40m2
  • 8 week construction of structural steel
  • Location Erskine Park, Sydney, NSW
  • Date April 2015
  • Read more

 

HYROCK – Copper Concentrate Store

A new facility at Port Kembla for the storage of copper concentrate prior to export, required a heavy steel roof to tie the thick concrete walls together. Wallandra is ideally equipped to fabricate the massive structure, and our experienced project management and erection teams made the on-site work look easy!

Borg Manufacturing

The high volume of manufactured board products that Borg Manufacturing produce every day, requires efficient storage and inventory flows, with erection of new buildings in the shortest possible time-frame a must. Expertise in large clear span buildings and high volume steel processing capabilities made Wallandra the perfect choice for this 850 tonne, 25,000 square metre project featuring multiple overhead cranes up to 50t capacity.

.