Tru-Flo – Factory and warehouse

Wallandra was engaged by Truflo Pumping Systems to construct their 3000 square metre warehouse and manufacturing facility. Wallandra’s project scope included 110 tonnes of structural steel, concrete slab, all cladding and roller doors and a 5 tonne gantry crane. Additionally, Wallandra supplied footings and over 400 square metres of precast concrete retaining walls.

The quality Wallandra steel building perfectly complements Truflo’s modern office facilities.

 

 

BlueStar Global Logistics

Covering 35,000 square metres of floor area and supported by 500 tonnes of Wallandra structural steel, this warehouse forms an integral part of Sydney’s warehousing and distribution industry. Completed in 2014 for BlueStar Global Logistics.

Toll in 2 Store

Even the largest of multinational logistics providers turn to Wallandra for the hassle free delivery of this distribution facility.

Oberon Air

With an eye for detail, management at Oberon Air chose Wallandra’s design and construction solution utilising a 40M span universal beam rafter design for their hangar. Finished in corporate colours and including a 24M wide sliding door, this quality steel building serves perfectly for storage and maintenance of their aerial survey fleet.

Cadia Plumbing – Head Office

This modern facility in Orange NSW completed in 2012 serves as head office and distribution centre for a plumbing supplies business, and is supported by a Wallandra steel frame.