Leandlease Designmake

Fast Facts

artist impression
• 15 000m2 + Office
• 400 tonnes of structural steel
• 26 loads of steel plus the stairs

Find more detail here

 

 

TNT – Super Hub

TNT-fleet-internal-close-up-strutural-steel-by-wallandra

Fast Facts

  • Structural Steel 850 tonnes
  • Area 30 000m2
  • Clearspans up to 40m2
  • 8 week construction of structural steel
  • Location Erskine Park, Sydney, NSW
  • Date April 2015
  • Read more

 

Access Industries

Using precast walls, rather than traditional tilt up Wallandra saved six weeks on the project. The Wallandra program from start to finish was only nine weeks, with the standing of the walls and structural steel taking only eight days. More detail

Tru-Flo – Factory and warehouse

Wallandra was engaged by Truflo Pumping Systems to construct their 3000 square metre warehouse and manufacturing facility. Wallandra’s project scope included 110 tonnes of structural steel, concrete slab, all cladding and roller doors and a 5 tonne gantry crane. Additionally, Wallandra supplied footings and over 400 square metres of precast concrete retaining walls.

The quality Wallandra steel building perfectly complements Truflo’s modern office facilities.

 

 

OfficeMax

Wallandra supplied and installed 310 tonne of structural steel to support the impressive OfficeMax project for Australand. Completed in 2013 this building included 20,000m2 housing offices and distribution centre.

 

 

 

.