Mileham Street Industrial Units

Stage 2 of the Mileham Street construction project is now complete, with Wallandra supplying and erecting over 22 tonnes of structural steel for the development of 12 industrial units. The final phase of of the Windsor based project is now underway and once complete, will comprise of 31 units in total.

Hay Storage Shed

Wallandra was commissioned to provide a complete Design and Construct (D&C) Building Solution for the development of this hay shed, situated in Orton Park, NSW. This included the submission of paperwork for the Development Application (DA) and Construction Certificate (CC), structural engineering, supply and erection of structural steel, roofing, cladding and project management.

The hay shed has been designed and constructed to provide the best possible storage solution for hay dry matter retention following harvest. The incorporation of gutters, sufficient drainage and 3 walls provides maximum protection from the rain and pooling water. The 8m wide bays also allow for multi-purpose usage; providing the ability for our client to store machinery and other equipment when the shed is not being used for hay storage.

 

 

Tuglow Shearing Shed

From concept to completion; Wallandra was commissioned to provide a full design and construct building solution for the development of this new shearing shed for Tuglow Sheep Station, situated in Ginkin, NSW. Spanning 1,000m2 at an elevation of 1,200m; the structural steel building facilitates the ability to shear over 5,000 sheep, along with allowing for sorting, wool storage and undercover loading facilities.